Select your language

简体中文 English Français Español
Third Phase of KTC Construction in Huizhou Passes Main Section Inspection
( Source:KTC   /   Send time:2019-11-04 )

The inspection group consisted of representatives from Construction Quality Supervision Department of Huizhou Zhongkai Hi-tech Zone, the institute in charge of the project design and other related organs. The group worked on the project files of KTC's third phase, application of construction materials, construction conditions, quality-control measures and self-inspections, and did a field inspection on the main section. The group reached a consensus that the construction of the main section was in accordance with rules and regulations as well as the design drawings; the construction was well managed with all data required; the project was qualified for every requirement on the checklist and ready to be accepted.

Every day and night committed to quality and safety.

The construction suffered a tight schedule, tough tasks and high pressure. KTC always kept safety in mind, with the principles of safety, civilization, quality and efficiency and the policies of putting safety and quality in priority, set strict rules on the material application and worked in accordance with construction drawings and specifications to ensure the project quality. During the construction, the worker groups first checked their work themselves and then had it checked by management personnel. There were two routine inspections on quality and safety every month. With the guideline of "Never forget the commitment and keep the mission in mind", they regularly scanned the construction for any problem which would be solved through immediate solutions.

Every detail aimed at excellence.

The project employed management personnel with engineering expertise and extensive experience to integrate the construction to make a clear division of work with effective interaction and coordination. On the basis of technical and safety disclosures, project managers strengthened the quality control over every section. No procedure would get started if the previous one hadn't been checked or failed the acceptance check.

KTC, with a responsible attitude for all the sections, spares no effort to ensure project quality while stressing safety work and civilized construction, and makes concerted efforts to complete the project with high quality.

Share:
Recent Posts
XML 地图